We plan to film the opening of our film on Sunday the 2nd of April which is the date all members of the production are available. This is a date that is approaching soon but gives our editor enough time to complete the process before the date the project is due. Hopefully, because we are filming on a Sunday, our public location will hopefully be quieter and less busy. Background noises of the public passing and public transport may be difficult to control, considering our location is in the City Centre. However if this problem becomes detrimental to the filming process and quality, we have a backup location planned which is in a nearby, quieter area. We hope the weather will be dry and bright enough to film in and according to the BCC weather forecast, Sunday is meant to be a relatively dry day with slight winds. We will bring multiple umbrellas and we will either move to another location to film indoors or return on a drier day to film if the weather disturbs the filming process. Due to a lack of equipment, props and costumes there should not be any problems handling or travelling with what equipment we have.
Comments
Post a Comment